Maintenance

Janvier 2025
22 Janv 2025
1 maintenance

Upgrade core backbone

Maintenance

Résolu 22 Janv à 00:30 CET

Update our principal core backbone to patch bugs and others.

15 Janv 2025
1 maintenance

Upgrade T1 transit

Maintenance

Résolu 15 Janv à 10:00 CET

Customers using the infrastructure in Geneva may experience disruptions and micro outages.

Installation of Telia in secondary transit via Zurich, disruptions will start from 10am to 6pm.

Février 2025
28 Févr 2025
1 maintenance

Init7 - Routing Issue: West Switzerland

Maintenance

Résolu 28 Févr à 16:00 CET

We are experiencing an outage of our links between Geneva and Zurich. Because of our redundant network design, we do not expect any loss of service. Traffic is routed via alternate paths via Paris, Frankfurt or Marseille, due to this change you might experience increased Latency for the time being until the Line is up again.

https://www.init7.net/fr/support/faq/status-info/?ticket=267450

27 Févr 2025
1 maintenance

🚨 ALERT - Proxmox Node Down 🚨

Maintenance

Résolu 27 Févr à 11:30 CET

📍 Status: 🔴 Out of Service
🛠 Cause: Fault detected on the main network card
🔄 Current Action: Replacement requested, awaiting intervention

We will update this page as soon as new information is available. 🚧

Update:

The part is not in stock and will be replaced on Sunday at 3pm.

Back, however, several ports are limited to 1Gbps. This can make the network slower, and more latent.

13 Févr 2025
1 maintenance

Scheduled Maintenance Notice – Potential Network Disruptions

Maintenance

Résolu 13 Févr à 08:00 CET

We will be performing a major network installation at Interxion Zurich on Tuesday. During this process, network disruptions may occur throughout the day as we migrate and optimize our infrastructure.

🔹 What to expect?
• Temporary connectivity issues
• Potential latency spikes
• Brief service interruptions

We appreciate your patience and understanding during this transition. Our team will work to minimize downtime and ensure a smooth deployment.

For real-time updates, please check our st...

Mars 2025
04 Mars 2025
1 maintenance

Capacity Upgrade at IXN ZRH - Arelion/Telia Transit

Maintenance

Résolu 04 Mars à 16:00 CET

Capacity Upgrade at IXN ZRH - Arelion/Telia

Location: Zurich, ZRH-IXN
Start Time Maintenance Window: Tuesday, 2025-03-04 - 16:00
End Time Maintenance Window: Tuesday, 2025-03-04 - 17:00
Approximate Disturbance: 15min